“Radioactive Cover-Up” at Fukushima — Experts Believe “Other Sources of Contamination” Are Flowing into Ocean
ENERGY, 9 Mar 2015
ENENews – TRANSCEND Media Service
Emergency hearing with plant officials — “TEPCO decided long ago there was no need to monitor” the water with high-level radioactive materials (VIDEO)
1 Mar 2015 – Asahi Shimbun, Feb 28, 2015 (emphasis added): The nation’s nuclear watchdog body slammed [TEPCO] over its failure to disclose information on the leakage of radioactive rainwater into the sea… TEPCO President Naomi Hirose… apologized profusely… TEPCO became aware more than a year ago that the concentration of radioactive materials in the water flowing… was high [first disclosing it to regulators] January 2014… TEPCO continued to conceal details, including the fact that the concentration became high whenever it rained… However, TEPCO had decided long ago there was no need to monitor rainwater for radioactive materials.
NHK transcript, Feb 27, 2015 : Experts and local government officials visited the Fukushima Daiichi nuclear plant to examine sources of contaminated water flowing into the sea…Experts urged the operator to investigate whether rooftops of other reactor buildings are also sources of tainted water.
Yomiuri Shimbun, Feb 26, 2015: NRA chief slams TEPCO for data reporting delay… after rainwater contaminated with high-level radioactive materials leaked… into the sea… TEPCO reported in January last year that the radioactivity concentration in that trench was higher… TEPCO at last announced… high-level radioactivity [in water] on the rooftop of the No. 2 reactor building… might be one of the sources of contamination… The Economy, Trade and Industry Ministry… pointed out the likelihood of there being other sources of contamination… The Fisheries Agency on Wednesday conducted an emergency hearing with TEPCO officials… and told the utility firm to take measures to minimize damage impacting marine products… “We urge TEPCO to make details clear.”
Japan Times, Feb 26, 2015: [Tepco] admitted Thursday that its latest problem with radioactive water has shattered the trust it was building in Fukushima… and that the decommissioning of the Fukushima No. 1 plant might be delayed [after] the surge in radiation detected in the water draining into the sea… The utility said the source of the contamination is the roof of the No. 2 reactor building, which… remains heavily contaminated.
Naohiro Masuda, head of Tepco’s unit in charge of scrapping Fukushima Daiichi: “The trust of the people in Fukushima is the most important thing… we have damaged that trust… Due to the damaged trust, all of the schedules for the decommissioning tasks could be delayed.”
Arirang, Feb 26, 2015: Tokyo under fire for alleged cover-up of radioactive water — [TEPCO] is under heavy fire for staying silent over a radioactive leak… flowing into the Pacific Ocean.
Watch Arirang’s broadcast here | Watch NHK’s broadcast here
DISCLAIMER: The statements, views and opinions expressed in pieces republished here are solely those of the authors and do not necessarily represent those of TMS. In accordance with title 17 U.S.C. section 107, this material is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. TMS has no affiliation whatsoever with the originator of this article nor is TMS endorsed or sponsored by the originator. “GO TO ORIGINAL” links are provided as a convenience to our readers and allow for verification of authenticity. However, as originating pages are often updated by their originating host sites, the versions posted may not match the versions our readers view when clicking the “GO TO ORIGINAL” links. This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a ‘fair use’ of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use’, you must obtain permission from the copyright owner.